-
Car Parts Mold
-
Plastic Auto Parts Mould
-
Automotive Injection Mold
-
Double Shot Injection Molding
-
Medical Injection Molding
-
Multi Cavity Injection Molding
-
Electronics Injection Molding
-
High Temperature Plastic Mold
-
Unscrewing Mold
-
Home Appliance Mould
-
Gear Mold
-
Overmolding Injection Molding
-
Plastic Mold Components
-
StefanWe are pleased to have cooperated with ERBIWA, and thanks for your supports to our each project.
-
RobertIt's very nice to receive the molds with hig quality and superior service, but favourable price. We will continue to cooperate with you in future projects.
-
CarlosYou are a dynamic and powerful team, i have seen the future of Chinese manufacturing from you all.
HASCO S136 2 Cavity Mold For PMMA Plastic Household Products
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xShaping Mode | Plastic Injection Mould | Product | Household Product |
---|---|---|---|
Mould Base | LKM,DME,HASCO,LKM Mould Base | Cavity | 2 Cavity Mold |
Design Software | UG,AutoCAD,PROE,CAD,etc | Mould Life | 1,000,000 |
Certificates | ISO 9001 & IATF16949 | ||
High Light | S136 2 Cavity Mold,PMMA Plastic 2 Cavity Mold,HASCO Multi Cavity Injection Molding |
Product Name
|
Plastic Injection Mould |
Mold Material
|
1.2343, 1.2343ESR, S136, 718, 738H, P20, NAK80,1.2312,1.2738HH
|
Color
|
Normally White, Nature and Black |
Plastic Material
|
PVC/PA66/PC/PE/POM/PMMA/ABS/TPU/TPE/PE/PP.ETC.
|
Mold Cavity
|
Multi Cavity, Single Cavity or Family Mould
|
Mold life
|
1 Million Shots
|
Mold Runner
|
HRS, Moldmaster, Syventive, INCOE, Yudo Hot Runner or Cold Runner
|
Mold Base
|
LKM, HASCO, DME, MISUMI
|
Design Software
|
CAD, SolidWork
|
Certification
|
ISO9001: 2015 and IATF16949
|
Delivery Terms |
EXW
|
Payment Terms | Normally 40% deposit, 30% after T1 and 30% before shipment |
Our Strength:
1. Professional mold design as the production mould standards
2. Professional mold assembly staff with over 9 years experience
3. 2-shift fast manufacturing with CMM testing for each machining processes
4. Clear project schedule plan and on time delivery
5. Professional project management with efficient communication to make every minutes counts